Skip to content
  • EN
  • IT

Explore our Knowledge

  • All
  • Building
  • Environment
  • Hydraulic
  • Ports
  • Transport
  • Urbanization

Intervention on the Highway 51 – Executive Design – Tai di Cadore By-pass – Extraordinary Plan for accessibility to Cortina d’ Ampezzo – in the context of the Winter Olympic and Paralympic Games Milano Cortina 2026

Sanremo Ventimiglia Section – Feasibility Study – Sanremo Bypass First Lot Completion- Technical and economic feasibility design

ANAS-DG 27/18 -CAUDINA-A30-Highway Connection from Caserta to Benevento

ANAS-DG 160/20 Lot 7 Lazio Territorial Structure. Technical-economic feasibility design of the intervention on the S.S.260 PICENTE – AMATRICE

Completion of the A1 HIGHWAY-Connection road – ANAS DG 160-Lot 7 – Lazio Tor Vergata.

Connection of Road 106 Jonica to the area of Madonna di Polsi Sanctuary-Technical and Economical Feasibility Design

Rome (headquarters and operating office)
Via Luigi Luciani, 7 – 00197 Rome

Bologna (operating office)
Via Antonio Aldini, 5 – 40123 Bologna

Tel. (+39) 06.8546246
E-mail info@vams.it
PEC vams@postecert.it

  • This is VAMS
  • Our expertise
  • Case studies
  • Careers
  • Contact us
  • This is VAMS
  • Our expertise
  • Case studies
  • Careers
  • Contact us

Made by RdMedia S.r.l.

© 2024 V.A.M.S. Ingegneria S.r.l.  |  All rights reserved  |  Privacy policy – Cookie policy

  • Home
  • This is VAMS
  • Our expertise
  • Explore our Knowledge
  • Careers
  • Contact us
  • Home
  • This is VAMS
  • Our expertise
  • Explore our Knowledge
  • Careers
  • Contact us
  • EN
  • IT