Sanremo Ventimiglia Section – Feasibility Study – Sanremo Bypass First Lot Completion- Technical and economic feasibility design

< Back to case studies

Client ANAS SPA

Location Liguria

Services Feasibility study-Sanremo- Ventimiglia - technical and economic feasibility design 1st lot Sanremo Bypass

Status On going

DG 27/18-Lot 6  

 Feasibility Study of the intervention S.S.1Aurelia –Upgrading of the safety measures of the Sanremo Ventimiglia section.

Environmental Pre-feasibility study, Traffic study, Cost-benefit analysis, Study of 4 route alternatives, Design of road axis for a length of about 23 km, natural tunnels, viaducts.These studies have been carried out in order to identify alternative corridors to the SS1 Aurelia that would allow a lightening of the traffic of the coastal area, particularly intense in the summer periods with the main task to achieve a fast and safe connection between Sanremo and Ventimiglia.

TECHNICAL AND ECONOMIC FEASIBILITY DESIGN -FIRST LOT COMPLETION OF SANREMO BYPASS

The object of the project is a C1 type road axis, in continuity with the current State road 1 bis which extends for about 4.3 km starting from the existing San Giacomo tunnel, coming to connect with the the state road  Aurelia in the area of the Cava Cangiotti “Cava junction” in the Municipality of Sanremo. The path identified and developed aims to minimize environmental impacts while maintaining compatibility with insistent constraints of various types and types and minimize the areas of land occupation. Therefore, an attempt was made to optimize and rationalize the position of the works of art and the connecting roads with the existing road network. The road system connecting with the existing road network is built by means of 4 roundabouts positioned along the axis according to the criteria dictated by transport needs in order to create the most widespread network possible between the main traffic flow and the urban one.