Port of Viareggio- Detailed Design for integrated contract of the Works for the construction of a Dredging System and sediment transfer

< Back to case studies

Client Autorità Portuale Regionale -Porto di Viareggio

Location Viareggio- Toscana

Services Executive Design

Status Completed

Detailed Design for integrated contract of the Works for the construction of a dredging system and sediment transfer in the Port of Viareggio

The project is aimed at solving the problem caused by the strong tendency to silt up the port entrance ensuring its accessibility in safe conditions.
It develops the construction of a fixed plant, to allow the continuous pumping of dredging sands while favoring the balance of the western beaches.
The main object of the project is creating fixed structures to reduce the phenomenon of the deposit of marine sediments at the port entrance and on the seabed in front of it.
It has been developed respecting the environmental impact, integrating the structures with the landscape and the characteristics of the place; the Project provides structures with finishes similar to the boulders of the cliff and the laying of the Pead pipeline will be entirely buried in the stretch of sandy area.

Detailed description

Main Breakwater
• submerged reef at – 1.0 m above sea level. and length 100 m. oriented orthogonally to the breakwater with the function of intercepting the sedimentary solid flow;
• straight emerged reef + 4.50 m. above sea level and length of 56.50 m. oriented orthogonally to the breakwater with the function of rooting the submerged reef to the pier itself and protecting the areas behind from wave events coming from the II and III quadrants.
• a curvilinear submerged reef at -1.0 m above sea level with a minimum width of 17.80 m with the function of dissipating and attenuating wave events coming from the fourth quadrant;
• a curvilinear cliff emerged +3.30 m above sea level of limited length with the function of protecting the areas behind from wave events coming from the west;
• a square outside the current breakwater pier with an inclined plane in reinforced concrete at a height varying from +2.0 m to +3.0 m above sea level, with a higher altitude at the connection to the existing pier, with the function of a maneuvering area and service of the sand pipeline;
• a new reinforced concrete wave barrier wall c- +4.50 m above sea level placed to protect a gap of about 18 m in length to be opened inside the existing wall to allow the exit of the sand pipeline service vehicles.

The Sand Pipeline (Sabbiodotto)
Sediment transfer system consisting of a pair of parallel HDPE pipes of 450 mm, each about 540 m long, arranged according to a pseudo-curvilinear planimetric layout, with the starting point located in correspondence with the service area built on the breakwater and the arrival point on the new brush orthogonal to the breakwater.

Secondary Breakwater
The system is therefore completed with the construction of a minor cliff, arranged orthogonally to the breakwater, necessary to materialize the exit point of the sand, called “pennello di arrivo”.

Dredging “imboccatura “
To complete the project interventions after the laying of the underwater pipelines,: the Restoration of the port seabed at an altitude of -5.0 m above sea level at the access channel by dredging about 19.400 cubic meters of sediment over an area of about 7.0 s.m.