Port of Manfredonia Final Design of the Recovery and refunctionalization of the High Seabed Basin

< Back to case studies

Client Autorità di Sistema Portuale del Mare Adriatico Meridionale

Location Porto di Manfredonia Puglia

Status Completed

The recovery and re-functionalization of the the High Seabed Basin (BAF) in the industrial port of Manfredonia has been planned in order to restore and expand the characteristics of use and the area of the structure. The goals envisaged in the final design include the recovery of an existing structure, the High Seabed Basin of the industrial port of Manfredonia, in order to increase the ‘capacity’ of the existing structures, in terms of strength, stiffness and durability.