Port of Manfredonia Final Design of the Recovery and refunctionalization of the High Seabed Basin

< Back to case studies

Client Autorità di Sistema Portuale del Mare Adriatico Meridionale

Location Porto di Manfredonia Puglia

Status Completed

Port of Manfredonia – Final design of the recovery and re-functionalization of the High Seabed Basin (BAF) of Manfredonia

Re-functionalization of an existing structure, the High Seabed Basin of the industrial port of Manfredonia in

order to increase the ‘capacity’ of the existing structures, in terms of strength, stiffness and durability