Client Assessorato ai lavori Pubblici – Cagliari
Location Bosa- Sardinia
Services Final design -Detailed design- safety coordination during the design and execution phases- Site supervision-
Status On going
Final and Detailed Design, safety coordination during the design and execution phases, supervision of works related to the hydraulic defense works of the City of Bosa (NU).
The structural interventions planned for the mitigation of the hydraulic risk in the final stretch of the Temo river (crossing the historic center of the city of Bosa) involved the construction of works for the direct containment of floods and adjustments of existing structures and structures to protect the areas on the left and right of the river. In addition to the specific hydraulic defence interventions, the planned works also involved a series of works related to the complete functionality of the project and in particular: embankments that can overflow into the earth with protection of metal mattresses; embankment walls clad with exposed local stone; over-construction of roadways and new access ramps; pumping system; arrangement of sewer collector entrances; structural interventions (columnar treatments); construction of mobile gates; full alert monitoring system; green works. The sizing of the crowning heights of the longitudinal defences was carried out by imposing a height of 0.50 m with respect to the maximum water level reached by the flood with a return time of 50 years in the section in question, assuming that optimal regulation and management procedures of the releases from the Monte Cripu dam are activated. Particular attention has been paid to the insertion of the new works into the landscape and the existing urban fabric, remaining consistent with the construction techniques and aesthetic peculiarities found in situ, evaluating where possible the recovery and simple downsizing of the defense works already present (this is the case of the bank walls with quay, in reinforced concrete covered with trachyte blocks); the indications of the most recent projects relating to similar works in the same area of the city of Bosa have also been followed, in order to ensure a continuity, also visual, to the defensive system put in place and above all, the requests of the Municipality of Bosa itself have been taken into account and accepted, all aimed at seeking the least impact of the new works.




