New Reservoir for the irrigation district of ‘Consorzio di Bonifica Litorale Nord’- Feasibility Study

< Back to case studies

Client Consorzio di Bonifica Litorale Nord

Location Lazio

Services Feasibility Study

Status Completed

The feasibility study is part of the ‘Plan of measures to improve the efficiency of the irrigation service through the optimization of resources, the reduction of losses, the construction of water storage facilities and energy production’.
The intervention area is located within the irrigation district under the jurisdiction of the Consorzio di Bonifica Litorale Nord, located in the Cerveteri area (province of Rome).
The study envisaged the construction of a new water reservoir for hydroelectric power generation and the storage of renewable energy sources, characterised by the presence of a new dam.
The core of the dam is made of silty-clay material, with a concrete diaphragm and an upstream facing made of geotextile material protected by Reno mattresses. The water storage system consists of various structures and components, such as:
• Cup overflow
• Bottom outlet
• Exhaust outlet
• Intake and diversion structure
• Reinforced concrete exchange tank
The total capacity of the reservoir is 2,400,283.00 cubic metres