Hospital San Giovanni di Dio Melfi (PZ) Seismic adjustment-demolition and Reconstruction of Pavillion A – Technical and Economic feasibility design-Final design

< Back to case studies

Client Azienda Ospedaliera Regionale San Carlo Potenza

Location Melfi (PZ) Basilicata

Services Technical and Economic feasibility Design -Final Design

Status Completed

The object of the project is the seismic upgrading of Pavilion A of the San Giovanni di Dio Hospital in the city of Melfi (PZ), characterized by the demolition and subsequent reconstruction of a new building.

The project also deals with the intervention on some other halls:
Buildings “C” and “D” of the Historic Hospital and precisely at the level of the first floor of these pavilions.
The reorganization of the area affects the current endoscopy department, located in body “C” of the building which will be moved to body “D” where the New Endoscopy Department will be built, this in order to be able to relocate the U.O.C. of medicine and the New Hospitalizations in body “C”, in order to ensure the continuity of regular health activities as the latter are currently present in pavilion “A” subject to demolition and reconstruction.

FUNCTIONAL LAYOUT PAVILION “A “PROJECT
The intervention involves the complete demolition of pavilion A and the subsequent reconstruction.
Structural Aspects of the New Pavilion A:
1. Three-dimensional structural frame in reinforced concrete insulated at the base;
2. Development of the building on 6 levels above ground as well as the basement insulation floor;
3. Foundations, 100 cm thick slab, tax height about -4 m from the current ground level.
4. The excavations will be supported by a bulkhead of micropiles, 300 mm in diameter, solidified by a kerb at the head measuring 30 cm x 50 cm;
5. Elevation of the building with reinforced concrete pillars, mainly with a square section of 40 cm x 40 cm, on which the horizontals made as reinforced concrete slabs with a thickness of 30 cm rest, warped bi-directionally with a plate behavior.
From a structural point of view, the designed structure is seismic-isolated at the base thanks to elastomeric isolators with low damping.
The new building will be built with one floor more than the current one for a total of 6 floors and will contain the following functions:
• On the ground floor we find the clinics, changing rooms for hospital staff and the electrical substation.
• On the First, Second, Third and Fourth Floors there are inpatient wards with a capacity of 21 places on each floor
• Fifth Floor – photovoltaic and solar thermal panels, in addition to the refrigeration units of the air conditioning system.
• Sixth floor – Technological center on the roof

The intervention of the new pavilion “A” is classified as a new construction and falls within the scope of the requirements relating to the coverage of consumption through renewables and the installation of a minimum photovoltaic surface area according to Legislative Decree 199/2019.
The Pavilion A building will be classified as NZEB.
The project therefore included in pavilion A, locally and dedicated hot and cold production plants, in order to guarantee, through the use of systems powered by renewable sources, the simultaneous coverage of 65% of the sum of the consumption expected for the production of domestic hot water, winter air conditioning and summer air conditioning
The following interventions have therefore been planned:
• Domestic hot water production through the use of high-efficiency heat pumps and thermal solar panels installed on the roof
• Winter and summer air conditioning using a high-efficiency heat pump
• Photovoltaic: Installation of photovoltaic solar panels on the roof of the building and the technical volume to cover the required needs