Extension and strengthening of the Duca d’Aosta dam in the Port of Naples – Lot A Extension I and II excerpt- Lot B Strengthening

< Back to case studies

Client Autorità di Sistema Portuale del Mar Tirreno Centrale

Location Port of Naples

Services Detailed Design

Status Completed

Deatailed Design of Extension and strengthening of the Duca d’Aosta dam in the Port of Naples – Lot A Extension I and II excerpt- Lot B Strengthening

Lot A : The project involves the extension to the east, for a total length of 270.70 m, of the Duca d’Aosta breakwater in the Port of Naples with modular cellular caissons, to protect the eastern access channel.
The works consist of caissons based at a height of -15.00 above sea level, on a special stone bench surmounted by concrete superstructures and wave wall.
Lot B envisages the reinforcement of the Duca d’Aosta Dam with casting works and local restoration/repair interventions on the existing structures in correspondence with the sections characterized by greater vulnerability to weather and sea actions.
Localized interventions for the complete reconstruction of the wave wall and the massif above the existing caissons in correspondence with the sections characterized by collapses of the concrete structures, through the placement of artificial boulders, formwork with prefabricated panels, castings on site, formation of micropiles and filling of cavities for the structural restoration of the existing caissons;
Widespread works of local restoration/repair of the existing structures, extending over the entire 2.6 km of the Duca d’Aosta dam and the Thaon de Revel antemuralconsisting of:
• restoration and/or reconstruction of the lava stone crown;
• restoration work on underwater cavities found on the inner harbour quay front;
• repair of lesions on the breakwater wall;
• localized reconstruction of the torn parts of the ballast crowning the caissons;
• localized reconstruction of the access stairs to the breakwater;
• reconstruction of the stone face of the Thaon de Revel wave wall ;
• Demolition of the signal lights that are no longer usable;
• Construction of a signalling system for the edge of the dam with LED lighting fixtures powered by photovoltaic panels positioned on insulated poles at a height of more than 10 m.