Client EAUT – Ente Acque Umbre Toscane
Location Umbria
Status Completed
Casanuova Dam on the Chiascio River –
Stabilization and safety works of the right side and intake structure
Safety Plan – Executive design and coordination of Safety during the Design phase.
The activities in question concerned a geognostic survey campaign to support the design of interventions to mitigate the instability of the right side. In particular, a stabilization embankment and various related works were designed, as well as the renovation of derivation and discharge structures.

